PCW Method
This is a new construction method that makes it possible to carry out work in areas that were previously difficult to access!
The "PCW method" is a technique that allows for the construction of embankment structures with minimal excavation of the existing road or terrain. By minimizing the regulations on the back side and allowing construction without the removal of existing structures, it leads to cost savings. Additionally, the width of the foundation bottom can be constructed at approximately 1 meter, allowing for minimal excavation and floor digging. 【Features】 ■ Minimal on-site construction ■ No need for unnecessary work ■ Foundation bottom width can be constructed at approximately 1 meter ■ Material that can be used in various locations ■ Material that reduces construction time *For more details, please refer to the PDF document or feel free to contact us.