Structural Construction Method - メーカー・企業と製品の一覧 | イプロス

Structural Construction Methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

PCW Method

This is a new construction method that makes it possible to carry out work in areas that were previously difficult to access!

The "PCW method" is a technique that allows for the construction of embankment structures with minimal excavation of the existing road or terrain. By minimizing the regulations on the back side and allowing construction without the removal of existing structures, it leads to cost savings. Additionally, the width of the foundation bottom can be constructed at approximately 1 meter, allowing for minimal excavation and floor digging. 【Features】 ■ Minimal on-site construction ■ No need for unnecessary work ■ Foundation bottom width can be constructed at approximately 1 meter ■ Material that can be used in various locations ■ Material that reduces construction time *For more details, please refer to the PDF document or feel free to contact us.

  • Earthworks
  • Pile and foundation work
  • Other civil engineering works
  • Structural Construction Method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録